Metro

Fashola approves reopening of Eko, Marina Bridges on Monday

Published

on

Mr Babatunde Fashola, Minister of  Works and Housing, has directed the reopening of both Eko and Marina Bridges to traffic in Lagos on Monday.

Fashola gave the directive as the ministry was expected to have concluded the first phase of repair works on the bridges in Lagos by mid-night on Sunday.

Mrs Blade Akinola, the ministry’s Spokesperson, said in a statement that the reopening followed the report by the contractor, Messrs Buildwell Plant &

Equipment Industries Limited, that the repair works on the First Phase was 100 per cent completed.

In his directives for the reopening of the Bridges, Fashola thanked Lagosians for their patience, understanding and cooperation while sections of the Bridges were closed.

He also directed that members of the public should be informed of any restrictions to traffic while

work is ongoing on the Second Phase of the project.

The minister added that while the completed section of the Eko Bridge (Lagos Island

Bound) should be reopened to traffic, work should commence immediately on the Alaka Bound side of the project.

Explaining further on the next phase of repair works on the Bridges, the Director Highways

(Bridges & Designs) in the ministry, Mr Emmanuel Adeoye, said work was taking off without the need for either partial or complete closure of the Bridges.

Fashola, however, added that the public would be informed adequately should such a step become necessary.

The 1,350 metre Eko Bridge, built in phases between 1965 and 1975, links the Lagos Island to the Mainland.

The News Agency of Nigeria recalls that the bridge was scheduled for closure to traffic in March 2020 in order to replace faulty joints and bearings.

But, as a result of COVID-19 lockdown, actual repair works commenced in the first week of June.

Work commenced in May on the first of the three phases in which repair works on the Marine Bridge was divided.

The repairs on the bridge, which is part of a network of complex bridges with several loops taking traffic in and out of the Apapa area of Lagos, included jacketing and skin repairs of the piers.

It also includes lifting the bridge section deck in order to change the electrometric bearing, milling and placing a new wearing course of asphalt

among others.

NAN also reports that the repair works on the Eko and Marine Bridges is part of the ongoing Federal Government’s Bridge Maintenance Programme.

The maintenance involves the repairs and rehabilitation of over 37 bridges nationwide with a substantial number already completed while others are at different stages of completion.

Edited By: Wale Ojetimi
Source: NAN

Surprise package Cadiz join Real Sociedad on top of La Liga Neymar out until at least mid-November, PSG coach says Schalke 04 re-signs jungler “Gilius” Schalke 04 held by Stuttgart as winless run stretches to 22 games NCDC confirms 170 new COVID-19 cases, 3 deaths Wolves beat Crystal Palace to climb to third in EPL Ex-lawmaker urges Ogun, Lagos govts to repair Abeokuta expressway Looters of NYSC camp will be apprehended, prosecuted, says police chief Flood: Bayelsa Govt begins technical study to tackle impact FG vows to discourage physicians’ “brain drain” from the country UN Chief calls for peaceful presidential polls in Ivory Coast Top two seeds Djokovic, Thiem ousted in Vienna Open quarter-finals COVID-19: Expert calls for campaign to help uplift Nigerians’ spirits. Curfew forces Belgium to move home venue for internationals Minister condemns destruction of medical equipment in Kogi Ronaldo recovers from COVID-19 infection England’s “Toothless Tiger” dies at 78 #EndSARS: Gov. Okowa says Nigerians need collective responsibility to rebuild the nation #ENDSARS: FRSC boss orders immediate resumption of operational activities EndSARS: Police say protesters attacked 205 public, private facilities Ekiti APC felicitates with ABUAD Founder, S’East governors, youths call for reduction of security roadblocks in region Makinde’s administration has paid N2.9 bn gratuity – Commissioner CSO calls for effective management, prioritisation of water, sanitation Senator extols virtues of Afe Babalola at 91 Gov. Akeredolu orders 7-day ultimatum for surrender of arms, ammunition in wrong hands President Buhari welcomes international partnership to spur development Navy Sailing Club to stage 3 races in November Feb. 23 fixed for Akeredolu’s inauguration for second term in office Klopp seeking solutions after Van Dijk surgery, Fabinho injury hamper Liverpool defence EndSARS: NGO wants Lagos panel to summon promoters of fake news ECOWAS to strengthen institutions to combat organised crimes United States stocks fall, indices head for weekly losses as virus cases spike UNESCO approves 3 additional biosphere reserves for Nigeria 2 teenagers found dead on Greek island after major quake Delta Schools resume, begin teleclass Nov. 2 – Commissioner Hold public office holders accountable to the people’- Gov. Wike charges NGE Mayhem: How we secured Surulere from hoodlums — Lagos youth leader Africa CDC warns of second wave of COVID-19 infections in Africa LASG flags off Eti-Osa-Lekki-Epe Expressway reconstruction project Sunday UN lauds FG for implementing programmes on women Protest: NASS C/River Caucus sues for peace Reps committee restates commitment to enforcing code of conduct Netherlands reports over 11,000 new infections for first time Coronavirus, social distancing and the Nigerian Women Entrepreneurs NAHCON mourns President of Hajj operators Zambian leader defends investments in road works Water Resources Control Bill: Minister decries misinformation of Nigerians Expert tasks mothers on child-spacing  Police inaugurate committee to assess losses during #EndSARS protest